Entry through the organiser
The organiser, a third party. We take no entries and have no part in the race.
Your trips on every device: sign in, or make a free account when you save one.
Signed in on this browser.
Sign in My marathons Account and dataLocked out? An export link you keep still opens your list in any browser.
No account: email it to me
One email with this trip and a link to open it again. We do not keep the address and send nothing else.
Only a race from our list can be emailed. An account keeps this one.
What we keep, and what we do notCheck your inbox at to confirm it.
Browse the racesEach edition the day it comes out, and nothing else. Off again with one click. How it is kept.
The half marathon turns at the Bunshokan, the former prefectural office built in 1916 and now an Important Cultural Property.
Before it, the route crosses the Chitose bridge into the Dōmachi foundry quarter, circles Kajo Park on the site of Yamagata Castle and runs down Nanokamachi, the main street where the Hanagasa festival parade passes and where the organiser expects the loudest support. The Yamagata City Hall stands on the way.
Sourced
The organiser calls the climb the place to hold on. The riverbank has about 2.3 km of cherry trees, and October is the season when the banks fill with imoni stew parties. Past the Gokoku shrine fewer than 5 km remain, and the Futakuchi bridge crosses to the far bank before the finish at the Yamagata City Sports Center.
Sourced
The first start of the day, the 3 km, was at 8:15. The 2026 course changed because the park works closed the old straight route: it now loops inside Kajo Park past the Honmaru palace site, the Higashi-Otemon gate and the Mogami Yoshiaki statue, and a detour near Izumicho avoids closing a residential street.
Sourced
Entry through the organiser
The organiser, a third party. We take no entries and have no part in the race.
More races to look at after the Yamagata Marugoto Marathon.
Imagery: Google Earth4:01 filmTokyo, Japan
Sun 7 Mar 202742.2 kmClimb 16 m
Climb summed after smoothing the heights over 1 km. The edge is this course's height profile on one scale for every race: 250 m above its lowest point fills it.
Kobe, Japan
Sun 15 Nov42.2 kmClimb 33 m
Climb summed after smoothing the heights over 1 km. The edge is this course's height profile on one scale for every race: 250 m above its lowest point fills it. Photo: Kobe, by Martin Falbisoner, CC BY-SA 4.0, via Wikimedia Commons.
Entry openKyoto, Japan
Sun 21 Feb 202742.2 kmClimb 144 m
Climb summed after smoothing the heights over 1 km. The edge is this course's height profile on one scale for every race: 250 m above its lowest point fills it. Photo: Fushimi Inari-taisha, by Saigen Jiro, CC0, via Wikimedia Commons.
Osaka, Japan
Sun 28 Feb 202742.2 kmClimb 34 m
Climb summed after smoothing the heights over 1 km. The edge is this course's height profile on one scale for every race: 250 m above its lowest point fills it. Photo: Osaka Castle, by 663highland, CC BY 2.5, via Wikimedia Commons.
Imagery: Google Earth3:56 filmRace weekAthens, Greece
Sun 8 Nov42.2 kmClimb 281 m
Climb summed after smoothing the heights over 1 km. The edge is this course's height profile on one scale for every race: 250 m above its lowest point fills it.
Imagery: Google Earth3:50 filmRace weekMalaga, Spain
Sun 8 Nov42.2 kmClimb 63 m
Climb summed after smoothing the heights over 1 km. The edge is this course's height profile on one scale for every race: 250 m above its lowest point fills it.
Imagery: Google Earth3:53 filmRace weekPorto, Portugal
Sun 8 Nov42.2 kmClimb 133 m
Climb summed after smoothing the heights over 1 km. The edge is this course's height profile on one scale for every race: 250 m above its lowest point fills it.
Imagery: Google Earth3:51 filmEntry openCuritiba, Brazil
Sun 15 Nov42.2 kmClimb 128 m
Climb summed after smoothing the heights over 1 km. The edge is this course's height profile on one scale for every race: 250 m above its lowest point fills it.